ZGS11-10 American Style Box Transformer Substation


As an important power supply unit in cabled distribution network,ZGS11-10 is widely used in urban and rural distribution network, which integrates high voltage control, protection, substation and distribution equipment into a complete set of preinstalled products.

category

ZGS11-10 American Style Box Transformer Substation

Key words

ZGS11-10 American Style Box Transformer Substation


Product description

As an important power supply unit in cabled distribution network,ZGS11-10 is widely used in urban and rural distribution network, which integrates high voltage control, protection, substation and distribution equipment into a complete set of preinstalled products.

We put high-voltage load switch and high-voltage fuse in transformer oil and it has two structural forms: commonbox or sub-box with transformer body.The tank is fully sealed structure and is equipped with oil temperature meter and oil level meter. Pressure gauges, pressure relief valves, drain valves and other components to monitor the operation ofthe transformer. The product is divided into ring network type, terminal type and power supply mode. In order to make this product more suitable for the actual requirements of China's power grid, our company has introduced a plug-in dryfuse, which does not affect the performance of the oil. According to the complexity of low voltage feed-out requirements,ZGS 11-10 strict products are divided into three shell forms: standard type, reinforced type and comprehensivetype, which makes users and design units more flexible and economical in type selection.

 

Product model and implication

FUDA

 

Service environmental conditions

◆Altitude: no more than 1000m

◆Ambient temperature:-30℃~+40℃。The outdoor wind speed does not exceed 35m/s.

◆A place where the vertical inclination is not more than 3° Cand there is no violent vibration.No corrosive or flammable gas, watervapor, etc.

 

lnstallation, use, maintenance, order

◆After completing the foundation of the product, press the anchor bolt, then install thein and out wiring.This is supposed to be used after checking.

◆In order to replace the high voltage fuse, the load switch should be disconnected so that the door can be operated.

◆The power supply should be cut off at first during the inspection.The operation procedure should be carried out in accordance with the instructions.

◆The buyers should confirm the model, specification, quantity, type, specification and shell paint of the electrical componentsbefore making an ordering.

◆It is very pleased to discussed details of production with the buyer when we make the deal.

 

Technical parameters

FUDA

Welcome your message consultation

submit

CONTACT US

Address: No. 88, Huanghe Road, High-tech Zone, Liaocheng City, Shandong Province

TEL:0635-5085330

FAX:0635-5085336 

E-Mail:sdfdbyq2024@163.com

Official website QR code

图片名称

Copyright © 2022 Shandong Fuda Transformer Co., Ltd.  SEO